No.6 Naphtha Cracker ComplexInception

Inception

A land expansion project that elevate national competitiveness

In view of the long-term shortage of basic petrochemical materials in Taiwan that dampened development of the midstream and downstream petrochemical industries, Formosa Plastics Group proposed the Sixth Naphtha Cracking Project for alleviating theproblem and acquired government approval in 1986. The first selection for the project site was a 280-hectare property in Lizi, Yi-Lan. Due to subsequent irrational objections of local opposition, the project was moved to Guanyin, Taoyuan in 1988, and then aborted for similar reasons.

In 1991, with blessings of both the local government and the residents, the project chose to settle down in the off-shore industrial zones in Yunlin County of Mailiao and Haifong, by way of reclamation, for building up an oil refinery plant with annual capacity of 25 million tons of crude oil, naphtha cracking plants for producing 2.94 million tons ethylene per annum, and other petrochemical plants, heavy machinery plants, a co-generation plant, and the Mailiao Industrial Harbor. In addition, in view of the serious power shortage in Taiwan, which impacts greatly on people's lives as well as on businesses, a thermal power plant with a capacity of 3 million kilowatts was therefore planned; all of the generated power will be incorporated into the TPC power supply system, for assisting on the relief of the domestic power shortage.

Total investment of 53 plants in the four phases of the No. 6 Naphtha Cracking Project, including the industrial harbor and the power plant, was US$25.21 billion, and the project was completed and has already began production.